The Challenge
The office property pursued voluntary accessibility improvements to proactively address exterior ADA barriers and strengthen long-term compliance.
Existing parking layout conditions, accessible route slopes, and entry transitions required refinement to align with current accessibility standards.
The objective was to implement corrections before enforcement action or legal claims, while maintaining normal tenant operations.
The Solution
Protrk® coordinated site evaluation and construction planning to update parking layout configurations, refine accessible routes, and correct entry transitions.
Concrete and asphalt adjustments improved slope performance and path-of-travel alignment, allowing the accessible route from parking to entry to function properly while preserving the existing site layout.
Key actions taken:
- Evaluated parking layout and accessible route alignment
- Adjusted concrete and asphalt surfaces to correct slope conditions
- Refined path-of-travel connections from parking to building entry
- Installed compliant accessible parking signage and stall markings
- Sequenced construction to maintain tenant access and minimize disruption
The Result
The office complex now maintains improved exterior ADA accessibility with a properly configured path of travel connecting parking areas to the primary building entry.
The voluntary upgrades strengthened the property's overall ADA compliance posture while improving usability for tenants and visitors.
Project outcomes:
- Established a compliant accessible route from parking to building entry
- Improved parking layout clarity and accessible stall designation
- Enhanced exterior path-of-travel performance across site surfaces
- Reduced potential exposure to accessibility-related claims
- Completed upgrades while maintaining normal tenant operations